Work Steps

Work  Steps :


1. inspection for the place of installation.


2. Determine the daily rate consumption .


3. Design the appropriate system.


4. Network plumbing Insulation thermally to avoid thermal waste through pipes.


5. System assembly above the roof of the house while avoiding the shadow that affects the efficiency of the system.


6. Connect the solar system with electronic control unit which can control the packaging - the temperature and Electric heater automatically.


7. Checking on the efficiency of the system and the work of all the components.


8. Periodic maintenance of the system which is a cleaning of the solar collector of lingering dust.